upcoming events

Jun 2017
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
MANUFACTURING BOOM IN VIETNAM
Wed - 21/6/2017
Status: Active
22 23 24 25 26 27 28 29 30

Survey

1. What do you consider the largest Risk for your company?

2. What are the Risk Mitigation Strategies you apply?

Submit

Galleries

This event is open for all professionals interested or currently working in Starups in Hanoi, or supply chai professionals in Hanoi, or who are interested in looking for business collaboration for U.S. market through meeting with a delegation of Baylor University (U.S.), Executive Master Program.

CAREER OPPORTUNITIES

PLANNING TEAM LEAD (FOR NEWLY SET-UP FACTORY IN VISIP 2A, BINH DUONG)

Team Lead: Lead local planning team, develop capability of planning team and manage back-up within team etc.

OPERATIONS MANAGER - CARGILL

The responsibilities of this position are to ensure the efficiency in import/export handling, 

QUảN LÝ CHUỖI CUNG ỨNG/ SUPPLY CHAIN MANAGER

Tham mưu cho Ban Giám Đốc trong công tác hoạch định kế hoạch mua hàng và cung ứng hàng hóa vật tư phục vụ hoạt động sản xuất kinh doanh và tổ chức điều hành kho bãi trong hệ thống sản xuất kinh doanh của Công ty.

LEAN MANUFACTURING QUIZ III

1. Choose the statement that is not correct:













2. What can be considered as Value for the Customer?













3. The 5 “W” to be considered during a Root Cause Analysis are:











4. Lean is a system of … to identify and eliminate wastes in production.











5. Which is below increased through lean implementation?









6. One of lean principles is:









7. The purpose to identify and eliminate wastes in lean production is:









8. Wastes of motion is?









9. “Make more products than customer requires” is waste of?









10. Arrange the activities in right order (5S)









11. A production system that all processes connected and follow customer demand is?







12. Customer demand is 100 products, and available working time is 15 hours, calculate the Takt Time?









13. In order to reduce cycle time, the first thing that a factory can consider is?









14. Process A cycle time is 5sec, while process B is 7sec, calculate the WIP between A & B in 7.5 hours shift working?









15. Process A cycle time is 5sec, while process B is 3sec, calculate the WIP between A & B in 7.5 hours shift working?









16. Calculate the maximum output of this production line below?









17. Cycle time should be balanced with?









18. For most unimproved processes, the amount of value-added work relative to incidental work and waste is approximately:











19. Which of the following is considered value-added work?











20. The greatest waste of all is the waste of:











Submit