upcoming events

Nov 2018
1 2 3 4 5 6 7
SEAMLESS VIETNAM 2018
Wed - 7/11/2018
Status: Active
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
VIETNAM SUPPLY CHAIN OUTLOOK 2019
Thu - 22/11/2018
Status: Active
23 24 25 26 27 28 29 30

Survey

1. What do you consider the largest Risk for your company?

2. What are the Risk Mitigation Strategies you apply?

Submit

Galleries

This event is open for all professionals interested or currently working in Starups in Hanoi, or supply chai professionals in Hanoi, or who are interested in looking for business collaboration for U.S. market through meeting with a delegation of Baylor University (U.S.), Executive Master Program.

CAREER OPPORTUNITIES

FAR EAST PLANNING MANAGER - WAHL VIETNAM CO.,LTD

Manage business relationship with co-workers, stakeholders, suppliers and customers

PROCESS DELEGATE SPECIALIST - BOSCH VN

The Bosch Group is a leading global supplier of technology and services, in the areas of automotive and industrial technology, consumer goods as well as building technology. 

LOGISTICS OPERATIONS COORDINATOR - CEL CONSULTING
A firm specialized in Demand and Supply Management in Emerging Markets: We create an impact where it's most needed

Solog Warehouse

2015-08-05 17:25:38

Share with friends


Solog DC – Specs Sheet

 

Specifications

WH 01

WH 02

WH 03

Footprint

11,284 sqm

25,368 sqm

3,864 sqm

Warehouse offices, total space

GF+F1, 560 sqm

2*(GF+F1), 2*540 sqm

GF, 194 sqm

Length x width

92 mL x 112 mD

253 mL x 96 mD

55 mL x 62 mD

Clear height/ Highest height

11 m/ 15 m

Interior column

01 row

01 row

None

Bay spacing

8 m

9 m

9 m

Loading dock

420 sqm

Closed dock

260 sqm

Door type

Overhead sectional doors

Open dock doors (5.0 mW x 4.0 mH)

8 front

0

5 front

Closed dock doors (2.8 mW x 3.0 mH)

12 back

42 front, 16 back

Dock leveler

8 front, 6 back

20 front, 6 back

5 front

Floor, floor bearing

Coated with hardener, load capacity 5 tons/m2

Floor elevation

1.3 m

Insulation

Roof only: black foam VIP, 5 mm thick, aluminum coated

Ventilation

Ridge ventilator on roof, louvers on wall, insect/weather baffle

Translucent (Sky light)

Roof and wall: Fibreglass sheet by Ampelite

Light

200 lux, led lights, 110 W

Fire fighting system

Fire alarm system, automatic sprinkler system

Construction schedule

Finish by Oct-2015

Finish by end of 2015