upcoming events

Apr 2021
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Survey

How is your business in 2020? Please score from 0 - 10.

How do you expect 2021 to be from a business performance standpoint (vs. 2020)?

Please help us understand more about you. Your gender?

Your Current Management Level

Your Company Businesses

Submit

Galleries

Vietnam's coffee exports in January are estimated to have dropped 17.6 percent from a year earlier to 120,000 metric tons, while rice exports likely fell 29.5 percent, government data released on Friday showed.

CAREER OPPORTUNITIES

DEV-OPS ENGINNER- CEL

We are looking for a DevOps to help build out, maintain, and troubleshoot our rapidly expanding IT infrastructure. You will be part of a talented team that demonstrates superb technical competency, delivering mission-critical infrastructure and ensuring the highest levels of availability, performance, and security.  The qualified systems engineer will have a background of at least 2 years in a DevOps position.

 
ADVISORY SENIOR CONSULTANT- CEL

We’re Hiring

ADVISORY SENIOR CONSULTANT

Location: Ho Chi Minh City, Vietnam

 

ADVISORY SENIOR CONSULTANT- CEL

A firm specialized in Demand and Supply Management in Emerging Markets: We create an impact where it's most needed

Solog Warehouse

2015-08-05 17:25:38

Share with friends


Solog DC – Specs Sheet

 

Specifications

WH 01

WH 02

WH 03

Footprint

11,284 sqm

25,368 sqm

3,864 sqm

Warehouse offices, total space

GF+F1, 560 sqm

2*(GF+F1), 2*540 sqm

GF, 194 sqm

Length x width

92 mL x 112 mD

253 mL x 96 mD

55 mL x 62 mD

Clear height/ Highest height

11 m/ 15 m

Interior column

01 row

01 row

None

Bay spacing

8 m

9 m

9 m

Loading dock

420 sqm

Closed dock

260 sqm

Door type

Overhead sectional doors

Open dock doors (5.0 mW x 4.0 mH)

8 front

0

5 front

Closed dock doors (2.8 mW x 3.0 mH)

12 back

42 front, 16 back

Dock leveler

8 front, 6 back

20 front, 6 back

5 front

Floor, floor bearing

Coated with hardener, load capacity 5 tons/m2

Floor elevation

1.3 m

Insulation

Roof only: black foam VIP, 5 mm thick, aluminum coated

Ventilation

Ridge ventilator on roof, louvers on wall, insect/weather baffle

Translucent (Sky light)

Roof and wall: Fibreglass sheet by Ampelite

Light

200 lux, led lights, 110 W

Fire fighting system

Fire alarm system, automatic sprinkler system

Construction schedule

Finish by Oct-2015

Finish by end of 2015